HP General IO Connectivity Instalační manuál Strana 10

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 14
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 9
Installation Overview & Planning
Installing HP Fabric Clustering System
Chapter 1
10
Screw locations are the same in the switch regardless of rail orientation.
Figure 1-7 Rail-to-Switch Attachment Locations
Figure 1-8 Attach Rail to Switch
Step 3. Repeat steps Steps 1 and 2 on the other side of the switch.
The two sliding rails should still be unattached.
Step 4. Loosely attach the switch with one screw through the front of each rail.
CAUTION Temporarily support the switch until the sliding rails are attached.
Figure 1-9 Loosely Attach Rail to Rack
CAUTION Do not let the switch hang unsupported from only the fixed rail flanges.
Attach rail to switch in
Bezel end
the (6) locations highlighted in white.
Zobrazit stránku 9
1 2 ... 5 6 7 8 9 10 11 12 13 14

Komentáře k této Příručce

Žádné komentáře