Hp UPS Extended Runtime Module Uživatelský manuál Strana 15

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 65
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 14
Installation 15
WARNING: To reduce the risk of personal injury or damage to the equipment, be sure that:
The leveling feet are extended to the floor.
The full weight of the rack rests on the leveling feet.
The stabilizing feet are attached to the rack if it is a single-rack installation.
The racks are coupled together in multiple-rack installations.
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
NOTE: If preparing the rails for integrated shipping, follow the same instructions as in
"Installing the UPS (on page 18)."
NOTE: Mounting hardware for square- and round-holed racks is included in the UPS kit.
1. Loosen the wing nuts or hex nuts, and then extend the brackets to the desired length.
Zobrazit stránku 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 64 65

Komentáře k této Příručce

Žádné komentáře