Hardware options installation 58
5.
Install the expansion board.
6. Install the shipping screw, if necessary. For more information, see "Securing an expansion board for
shipping (on page 58)."
7. Close the expansion slot retainer.
8. Connect any required internal or external cables to the expansion board.
9. Install the access panel.
10. Power up the server (on page 25).
11. Resume normal server operations.
Securing an expansion board for shipping
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless
all expansion slots have either an expansion slot cover or an expansion board installed.
1. Power down the server (on page 25).
2. Extend the server from the rack (on page 25).
3. Remove the access panel (on page 26).