HP Vectra VEi7 Technické informace

Procházejte online nebo si stáhněte Technické informace pro Barebones pro PC / pracovní stanice HP Vectra VEi7. HP Vectra VEi7 System information Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 77
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
IST-2000-25187
Deliverable D4.3
Evaluation of Phase I Field Trial
TORRENT
IST-2000-25187 PUBLIC Page 1 of 77
Project Number: IST-2000-25187
Project Title: TORRENT
Deliverable Security*: PU
CEC Deliverable Number: D4.3
Contractual Date of Delivery to the CEC: 30.11.2002
Actual Date of Delivery to the CEC:
Title of Deliverable: Evaluation of Phase I Field Trial
Work package contributing to the Deliverable: WP4
Type of Deliverable**: R
Author: Isabel Borges
Contributors: M.Potts, G.Grun (MCLab); R. Tolstra
(tesion); W. Payer (UST); I. Mountzouris
(Intracom); V. Apostolopoulou, P.
Karapanagiotis (TEMAGON); A.
Costoloni (Flextel); T. Konstali (Telenor);
P. Rolo (PTIN)
* Security: PU Public, PP - Restricted to other programme participants (including the Commission Services)
RE - Restricted to a group specified by the consortium (including the Commission Services)
CO - Confidential, only for members of the consortium (including the Commission Services)
** Type: R - Report, P - Prototype, D - Demonstrator, O - Other
Abstract:
This deliverable is concerned with the validation of the key functionalities of the first phase of
the TORRENT test-bed, covering the customer premises, access network and the local access
point. It will provide important input to phase two of TORRENT, especially the field trials. The
significance of the results to exploitation will also feature here.
Keywords: Field trial, functionalities, testing, network management, evaluation
Zobrazit stránku 0
1 2 3 4 5 6 ... 76 77

Shrnutí obsahu

Strany 1 - Mountzouris

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 1 of 77 Project Number: IST-2000-25187 Proje

Strany 2

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 10 of 77 In the Figure 2 (IPv4 case) the meas

Strany 3 - Executive Summary

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 11 of 77 TEMAGON – Field Trial Tests

Strany 4 - Table of Contents

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 12 of 77 3.2.2 PTIN Figure 5 shows the con

Strany 5

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 13 of 77 The proposed scenario will allow to

Strany 6 - 2 Objectives

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 14 of 77 3.2.3 Telenor This trial will be fo

Strany 7

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 15 of 77 Figure 9: Existing infrastructure

Strany 8

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 16 of 77 User equipment Each T-RG will at l

Strany 9 - 3.2 Phase 2 field trials

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 17 of 77 The terminals will use dynamic IP ad

Strany 10

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 18 of 77 Figure 11a tesion)) Backbone (partia

Strany 11 - SPLITTER

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 19 of 77 Figure 11b: Connection of Basel and

Strany 12

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 2 of 77 © This Deliverable is Copyright of t

Strany 13

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 20 of 77 Initial test set-up The figure belo

Strany 14 - TORRENT

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 21 of 77 Figure 13:IPv4 tesion set-up The co

Strany 15

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 22 of 77 New test set-up using IPv6 Since thi

Strany 16 - User terminals

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 23 of 77 Within a short timeframe the alterna

Strany 17

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 24 of 77 4 MCLab TORRENT testing 4.1 Resident

Strany 18

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 25 of 77 The access network is based on ADSL

Strany 19

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 26 of 77 Functions IPv4 IPv6 Description I

Strany 20 - Initial test set-up

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 27 of 77 Functions IPv4 IPv6 Description I

Strany 21

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 28 of 77 Functions IPv4 IPv6 Description I

Strany 22

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 29 of 77 4.2 ISDN – Intracom netMod Network

Strany 23

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 3 of 77 Executive Summary This deliverable pr

Strany 24 - 4 MCLab TORRENT testing

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 30 of 77 • Plug and play installation • Web-

Strany 25

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 31 of 77 Figure 18. RG API architecture 4.2.

Strany 26

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 32 of 77 forwarding get_forwarding getforwar

Strany 27

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 33 of 77 • Through the Linux NETLINK API. In

Strany 28

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 34 of 77 In Figure the MCLab configuration of

Strany 29 - 4.2 ISDN – Intracom netMod

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 35 of 77 •Remote access to the RGs for remote

Strany 30

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 36 of 77 From remote you can log in to the Ma

Strany 31 - Set (enable/disable) IPv4

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 37 of 77 Destination Gateway Genmask Fl

Strany 32

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 38 of 77 login: root, pw: icom-rg login torre

Strany 33

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 39 of 77 NETMASK=255.255.255.0 BROADCAST=192.

Strany 34 - Network configuration

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 4 of 77 Table of Contents Executive Summary.

Strany 35 - LAP (Flextel System)

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 40 of 77 GATEWAY=192.168.1.1 Configuration o

Strany 36 - •/root/SWITCH/aal5swd

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 41 of 77 subnet 193.72.156.224 netmask 255.25

Strany 37 - RG 1 & 2

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 42 of 77 •http://193.72.156.84 (only remote u

Strany 38

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 43 of 77 The file “config” defines interfaces

Strany 39

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 44 of 77 DOMAIN=mclab.ch # untouch parameter

Strany 40

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 45 of 77 echo "Hostname (fully qualified

Strany 41

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 46 of 77 echo "nameserver ${NAME

Strany 42

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 47 of 77 p=`pidof dnsmasq` if [ "${DHCP

Strany 43 - Deliverable D4.3

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 48 of 77 iptables -F iptables -t nat -F iptab

Strany 44

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 49 of 77 route add -net 192.168.0.0 gw 192.16

Strany 45

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 5 of 77 Abbreviations ...

Strany 46

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 50 of 77 4.4 Results of the tests At the last

Strany 47

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 51 of 77 F11_Test 1 – Support different user

Strany 48

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 52 of 77 F4_Test8 TC Name: Quality of the

Strany 49

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 53 of 77 Packet size (Byte) Response time (m

Strany 50

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 54 of 77 •Charging information (on request) •

Strany 51

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 55 of 77 TC Name: Emergency access to a basic

Strany 52 - F4_Test8

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 56 of 77 oAny other type of system failure (c

Strany 53 - F8_Test4

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 57 of 77 Measurement equipment used Simple ti

Strany 54 - F12_Test1

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 58 of 77 •Error tolerance (does the system al

Strany 55

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 59 of 77 ADLS Modem J500 at RG1 The ADSL li

Strany 56 - F12_Test2

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 6 of 77 1 Introduction The first deliverable

Strany 57 - F12_Test5

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 60 of 77 The ADSL link is not very stable and

Strany 58

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 61 of 77 6 Conclusions and Recommendations Th

Strany 59 - 5 Analysis of Results

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 62 of 77 It is recommended that field trials

Strany 60

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 63 of 77 7 Annex 1 7.1 Address Structure of t

Strany 61

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 64 of 77 o Net Mask o 255.255.255.224 Lo

Strany 62

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 65 of 77 o In the LAP actual configuration y

Strany 63 - IP Address Configuration

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 66 of 77 2 ADSL Intracom Modem – J500 RG+ 1

Strany 64

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 67 of 77 RG-API available at RG+ at workshop

Strany 65 - 7.4 TTCP and NETPERF

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 68 of 77 IPBJ500ADSLAccess Network SubsystemC

Strany 66 - ADSL Connection

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 69 of 77 Path under testIPBJ500ADSLAccess Net

Strany 67

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 7 of 77 3 Description of Field Trials 3.1 Pha

Strany 68

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 70 of 77 7.5.1 Throughput IPB Figure 24: Th

Strany 69

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 71 of 77 Figure 25: Delay measurements

Strany 70 - 7.5.1 Throughput IPB

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 72 of 77 7.5.2 Throughput Core Blade Figure

Strany 71

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 73 of 77 Figure 27: Delay measurements

Strany 72

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 74 of 77 7.5.3 Throughput Core Blade – RG1

Strany 73

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 75 of 77 Figure 29: Delay measurements From

Strany 74

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 76 of 77 Abbreviations ADSL Asynchronous D

Strany 75

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 77 of 77 8 References [1] TORRENT deliverab

Strany 76 - Abbreviations

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 8 of 77 The experiments foreseen for validati

Strany 77 - 8 References

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 9 of 77 3.2 Phase 2 field trials 3.2.1 TEMAG

Komentáře k této Příručce

Žádné komentáře