HP Quality Center Synchronizer 1.2 Uživatelský manuál Strana 67

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 130
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 66
Chapter 3 • Creating Synchronization Links
67
Mapping Endpoint Fields
You map fields between the two endpoints in a synchronization link.
To map endpoint fields for a link:
1 Verify that you are working in edit mode. For more information, see
“Editing Synchronization Link Settings” on page 99.
2 Navigate to the Field Mapping tab.
For a defects link, in the Links list, select the link and click the Field
Mapping tab.
For a requirements link, in the Links list, expand the link, select a
requirement type mapping, and click the Field Mapping tab.
Alternatively, from the Subtypes Mapping tab, under Mapped Subtypes,
select a requirement type mapping and click Configure.
The field mapping configuration options are displayed.
Zobrazit stránku 66
1 2 ... 62 63 64 65 66 67 68 69 70 71 72 ... 129 130

Komentáře k této Příručce

Žádné komentáře