Hp Virtual Connect Enterprise Manager Software Uživatelský manuál Strana 29

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 195
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 28
In the event of an unplanned failover, it is possible that manual intervention may be required to
restore full operations. If a VC Domain reports configuration mismatch or an out-of-sync occurrence
after recovering from an unplanned failover, the following actions are recommended.
Execute Mxsync in analysis mode (mysync) to determine the nature of the failure on the VC
Domain during the CMS recovery phase.
Execute Mxsync in execute mode (mxsync-e) during the CMS recovery phase, and follow
the Mxsync instructions until the VC Domains are synchronized.
If Mxsync detects and reports out-of-sync scenarios in additional subsystems, resolve them
according to instructions displayed, otherwise exit Mxsync.
NOTE: Executing mxsync e will help resolve VC Domain synchronization issues across multiple
VC domains.
Installing VCEM in an HA-clustered CMS configuration in a Microsoft Cluster Server cluster 29
Zobrazit stránku 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 194 195

Komentáře k této Příručce

Žádné komentáře