Hp ProLiant BL490c G6 Server-Blade Uživatelský manuál Strana 35

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 100
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 34
Hardware options installation 35
Install Type II mezzanine cards only on mezzanine 2 connector.
Optional mezzanine cards enable network connectivity and provide Fibre Channel support. For mezzanine
card locations, see the system board components (on page 7).
For mezzanine card signal mapping, see "Interconnect bay numbering and device mapping (on page 15)."
To install the component:
1. Power down the server blade (on page 11).
2. Remove the server blade (on page 12).
3. Remove the access panel (on page 13).
4. Remove the mezzanine connector cover.
5. Install the mezzanine card. Press down on the connector to seat the board.
6. Install the access panel (on page 13).
7. Install the server blade ("Installing a server blade" on page 17).
Zobrazit stránku 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 99 100

Komentáře k této Příručce

Žádné komentáře