Hp ProLiant ML110 G7 Server Uživatelský manuál Strana 59

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 113
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 58
Hardware options installation 59
o
For improved power efficiency and redundancy, install two HP CS power supplies:
12. Remove the four screws, and then loosen the drive cage.
13. Route and connect the redundant power supply cables to the system board.
14. Insert the four screws to tighten the drive cage.
15. Install any device originally installed in the upper optical drive bay.
16. Install the EMI shield in the lower optical drive bay.
17. Install the access panel (on page 21).
18. If the lower optical bay blank is not attached to the tower bezel, install it.
19. Lock the tower bezel.
20. Connect each power cord to the server.
21. Connect each power cord to the power source.
22. Power up the server (on page 19).
Zobrazit stránku 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 112 113

Komentáře k této Příručce

Žádné komentáře