Hardware options installation 58
o
Full-height device
7. Connect the four-pin power cable to the half-height or full-height drive.
8. Connect the data and power cables to the device.
9. Connect the power cable to the system board.
10. Connect the data cable to the system board or to an expansion board as directed by the option
documentation.
11. Slide the media drive fully into the bay until it is seated securely.
12. When removable media device installation is complete, install the following items:
o CD-ROM drive, if needed
o Bezel blanks
NOTE: If the second media bay is populated with an optional drive, store the extra bezel
blank for later use.
13. Install other hardware options as needed.