HP 100VG Uživatelská příručka Strana 8

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 32
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 7
Installation Summary
The basic hardware installation procedure for the Hub-7E is as follows:
1. Verify included parts
2. Verify that the hub works
3. Mount the hub
4. Complete network connections to the hub
1. Verify Included Parts
Each Hub-7E has the following components shipped with it:
HP AdvanceStack 100VG Hub-7E Installation and Reference
Guide—this manual (J3133-90001)
An AC power cord, one of the following:
Australia/New Zealand (8120-1369)
Denmark (8120-2956)
Europe (8120-1689)
Japan (8120-4753)
Switzerland (8120-4753)
United Kingdom/Hong Kong (8120-1351)
U.S./Canada (8120-1378)
power supply (0950-3058)
serial cable (5182-4794)
HP 100VG AnyLAN Technology Guide
mounting hardware:
two number 10 by half-inch pan head wood screws
four 4-40 machine screws
mounting bracket
Installation Summary
2
Zobrazit stránku 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 31 32

Komentáře k této Příručce

Žádné komentáře