HP ProLiant ML370 Generation 6 Instalační příručka Strana 103

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 282
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 102
4-10 Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide
Compaq Confidential Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: e-ch04 Installing the Rack Server-J.doc Last Saved On: 7/12/01 1:31 PM
3. Ensure that both server rails are balanced within the spring-load rail
assembly and slide the server smoothly to the back of the rack.
Figure 4-8. Aligning the server rails with the rack rails and inserting the
server
CAUTION: Keep the server parallel to the floor when sliding the server rails into
the spring-load rack rails. Tilting the server up or down can result in damage to
the rails.
IMPORTANT: If the server does not slide into the rack smoothly the first time, remove it
completely and reinsert the server rails into the spring-load rail assembly.
Zobrazit stránku 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 ... 281 282

Komentáře k této Příručce

Žádné komentáře