Hp Virtual Connect Enterprise Manager Software Uživatelský manuál Strana 75

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 136
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 74
1. Source resource validations—VCEM performs the following source resource validations:
Ensures that if the source server profile is assigned to a server, that the server is powered
off before the export operation.
NOTE: If the source server is not powered off, you must power it off and perform the
export operation again.
Confirms that the source VC Domain Group that the server profile belongs to has a status
of Configuration in synch. Server profiles belonging to a VC Domain Group with other
statuses such as the following list cannot be exported:
Under maintenance
Expired license
Incompatible firmware mode
If any of the Step 1 conditions are not attained, the prevalidation window (Export profile
prevalidation table (page 74)) displays an error for this step.
2. Target resource validations—VCEM performs the following target resource validations:
If the target device bay selected contains a server then the server must be powered off
before the export operation can be performed.
NOTE: If the target server is not powered off, you must power it off and perform the
export operation again.
Ensures that the target bay device does not have a server profile assignment.
Confirms that the target VC Domain Group that the server profile will be exported to has
a status of Configuration in synch. VC Domain Groups with other statuses such as the
following list cannot receive exported server profiles:
Under maintenance
Incompatible firmware
Ensures that the target VC Domain Group virtual MAC, WWN and Serial Number range
types are compatible with addresses allocated in the selected server profile. See
Table 4 (page 22)) for more information.
If any of the Step 2 conditions are not attained, the prevalidation window (Export profile
prevalidation table (page 74)) displays an error for this step.
3. Feature compatibility validations—The target VC Domain Group must be able to support all
the connections and features defined by the selected server profile. VCEM performs the
following validations in this step:
Ensures that the target VC Domain Group firmware mode supports iSCSI If the server
profile contains iSCSI connections
Ensures that the target VC Domain Group supports FC connections If the server profile
contains them.
Confirms that the target VC Domain Group firmware mode supports FCoE if the server
profile contains FCoE connections.
If any Step 3 condition is not attained, the prevalidation window (Export profile prevalidation
table (page 74)) displays an error status for this step.
4. Feature Validations related to Network—VCEM performs the following validations related to
the Ethernet connections data exportation:
Confirms that the target VC Domain Group supports server profiles with Ethernet
connections defined as Multiple Networks. If the server profile has defined a Ethernet
Exporting a server profile 75
Zobrazit stránku 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 135 136

Komentáře k této Příručce

Žádné komentáře