Hp Secure Key Manager Uživatelský manuál Strana 26

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 327
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 25
Figure 1 Identify the contents of the shipping carton
Item
Description
1
Appliance
2
Power cords (2 — 1 black, 1 gray)
3
Null modem cable
4
1U rack mounting hardware kit and documentation
5
Keys to the bezel (2 sets of 2 keys)
6DocumentationCD
71Uspacer
8
USB key
9
Completed appliance information sheet,
Pre-installation survey and checklist, and Installation
poster
NOTE:
Ifthisisareplacementappliance,notehowtheunitispackedintheshippingcarton. Handlethe
packing materials carefully so that you can repackage the old appliance using the replacement carton
and packing materials.
CAUTION:
There will be several tamper-evident labels. Do not cut or damage these labels because they are required
for FIPS compliance audits.
Selecting a rack location
Select a rack location that meets the space, airow, temperature, power, and electrical grounding
requirements described in Rack planning resources.
For adequate airow within the rack, use appropriate high airow inserts in rack cabinet doors and
observe industry standard practices for adequate spacing between racks or rows of racks.
NOTE:
Do not in
stall an appliance in the bottom unit of the rack; doing so will prevent the locking bezel cover
from op
ening.
26
Installing and replacing hardware
Zobrazit stránku 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 326 327

Komentáře k této Příručce

Žádné komentáře