
88 of 118
Running reports
After adding a node to be monitored, you can try running a report against the node you
have added using the following steps.
1. In the navigation tree, select the node that you want to run a report against.
2. Select the time period that you want to run a report against from the Window drop-
down box on the main tool bar. For more information, see Selecting a reporting
time period.
3. Right-click the node and select a report from the list of reports available on the pop-
up menu. For more information about available reports, see Types of reports.
4. The report will be run and the results displayed in the right-hand side of the user
interface.
Note:
After you change the timeframe, either click the Refresh icon or press Ctrl+R to
update the data.
Komentáře k této Příručce