Environmental requirements 21
WARNING: When configuring a solution, make sure that the floor loading specifications are
followed. Failure to do so can result in physical injury or damage to the equipment and the
facility.
10000 and 10000 G2 Series Rack footprint (600 mm [24 in] wide)
10000 Series Rack footprint (800 mm [31.5 in] wide)
Floor plan grid
A floor plan grid is used to plan the location of equipment in the computer room. In addition to its use for
planning, the floor plan grid should also be used when planning the locations of the following items:
Air conditioning vents
Lighting fixtures
Utility outlets
Doors
Access areas for power wiring and air conditioning filters
Equipment cable routing