6.
Install the DIMM.
7. Install the air baffle.
8. Install the access panel (on page 24).
9. Install the server into the rack ("Installing the server into the rack" on page 35).
10. Power up the server (on page 22, "Powering up and configuring the server" on page 37).
For more information about LEDs and troubleshooting failed DIMMs, see "Systems Insight Display LEDs
and health LED combinations (on page 9)."
Hot-plug SAS hard drive options
When adding hard drives to the server, observe the following general guidelines:
The system automatically sets all device numbers.
If only one hard drive is used, install it in the bay with the lowest device number ("Hard drive
numbering" on page 15).
Drives should be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.
Installing a hot-plug SAS hard drive
1. Remove the SAS hard drive blank.