Hp ProLiant ML350 G4 Server Uživatelský manuál Strana 70

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 156
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 69
70 HP ProLiant ML350 Generation 4p Server User Guide
9. Connect any required internal or external cables to the expansion board.
Refer to the documentation that ships with the expansion board.
10. Reinstall the expansion board retainer, then tighten the thumbscrew.
11. Replace the front bezel ("Removing the Front Bezel (Tower Model)" on page
27
), if applicable.
12. Replace the access panel ("Removing Access Panel" on page 27
).
VHDCI or HD68 SCSI Cable Option
The VHDCI or HD68 SCSI Cable connects the server to external SCSI-based
storage or backup devices.
IMPORTANT: To install the external SCSI option, an internal SCSI
channel must be dedicated for external use only.
In addition to the VHDCI or HD68 SCSI cable, you will also need:
T-15 Torx screwdriver
Flat-head screwdriver
To prepare the server before installing or removing options:
1. Power down the server ("Powering Down the Server" on page 25
).
2. Extend the server from the rack, if applicable ("Extending the Server from
the Rack" on page 26
).
3. Remove the front bezel door, if necessary ("Removing the Front Bezel
(Tower Model)" on page 27
).
4. Remove the access panel ("Removing Access Panel" on page 27).
WARNING: To reduce the risk of electric shock or damage
to the equipment, disconnect power from the server by unplugging
all power cords from the electrical outlets.
CAUTION: Failure to correctly power down the server could
result in damage to equipment or loss of information.
Zobrazit stránku 69