Hp ProLiant ML350p Gen8 Server Uživatelský manuál Strana 73

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 145
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 72
Hardware options installation 73
o
For tower models, open and remove the bezel ("Remove the tower bezel" on page 21).
o For rack models, if installed, remove the security bezel (on page 21).
2. Remove the drive blank.
Installing a hot-plug drive
WARNING: To reduce the risk of injury from electric shock, do not install more than one drive
carrier at a time.
The server can support six drives in a LFF configuration, or eight drives in a SFF configuration.
To install the component:
1. Do one of the following:
o For tower models, open and remove the bezel ("Remove the tower bezel" on page 21).
o For rack models, if installed, remove the security bezel (on page 21).
2. Remove the drive blank.
Zobrazit stránku 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 144 145

Komentáře k této Příručce

Žádné komentáře