Hp Hitachi Dynamic Link Manager Software Uživatelský manuál Strana 371

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 746
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 370
4. HDLM Operation
347
# /opt/DynamicLinkManager/bin/dlnkmgr view -sys -audlog
Audit Log : off
Audit Log Category : -
Audit Log Facility : -
KAPL01001-I The HDLM command completed normally. Operation name
= view, completion time =
yyyy/mm/dd hh:mm:ss
#
For details on the displayed items and their descriptions, see 6.7 view (Displays
Information).
(2) Setting Up the Operating Environment
To set up the HDLM operating environment, execute the
dlnkmgr command's set
operation. This operation allows you to set up the following functions:
Load balancing
Path health checking
Automatic failback
Intermittent error monitoring
Error log collection level
Trace level
Error log file size
Audit log data collection
Audit log facility
Number of times the same path can be used for load balancing
For details on how to set up each function, see 6.6 set (Sets Up the Operating
Environment).
For example, to set up the log level, execute the
dlnkmgr command's set operation
with the
-ellv parameter specified. When the confirmation message is displayed,
enter
y to execute, or n to cancel the command.
The following is an example of executing the command:
# /opt/DynamicLinkManager/bin/dlnkmgr set -ellv 1
KAPL01049-I Would you like to execute the operation? Operation
name = set [y/n]: y
KAPL01001-I The HDLM command completed normally. Operation name
= set, completion time = yyyy/mm/dd hh:mm:ss
Zobrazit stránku 370
1 2 ... 366 367 368 369 370 371 372 373 374 375 376 ... 745 746

Komentáře k této Příručce

Žádné komentáře